Outdoor Stage Roof at Norris Middle School

Theros ipso unum hectare lorem ipso

 Local boyscout Colton Zenni approached ETCDC with a plan to build a roof structure onto an existing stage as part of his Eagle Scout Project. 

Through meetings with the Colton, his parents, and volunteer professionals ETCDC prepared a conceptual plan for the project. A special thanks to Robert Johnson with Civil & Environmental Consultants, Inc. and Ken Barry with S&ME, Inc. for engineering coordination to make this project a reality. 

The project will be managed by the boy scout troop with guidance from volunteer construction professionals. 

ImageImage
PROJECT OVERVIEW
  • YEAR: 2018
  • BUDGET: $5M
  • THEROS IPSO
  • WINGARDIUM LAVIOSA
  • Hectera lorem ipso theros ipso unum eros
  • Theros ipso unum eros lorem ipso unum
  • Wingardium leviosa eros unum lorem onio
  • Eros unum jheegala lorem erosium ipso
ImageImage
Theros ipso unum
Theros ipso unum wingardium leviosal

This is some demo text. This is some demo text. This is some demo text. This is some demo text.This is some demo text.

SIMILAR PROJECTS

PROJECT


Lorem ipsum dolor sit amet, consectetur.

PROJECT


Lorem ipsum dolor sit amet, consectetur.

PROJECT


Lorem ipsum dolor sit amet, consectetur.

PROJECT


Lorem ipsum dolor sit amet, consectetur.